(1)
Unplanned Maintenance Triggered the Failure Mechanism in the Barquisimeto Health Sciences Dean’s Office Building. Gaceta Técnica 2025, 26 (2), 14-23. https://doi.org/10.51372/gacetatecnica262.2.